NYTIP – enhancing the nyc subway, part 6: putting it all together

UPDATE (04.02.2021): Post revised to reflect updates to the Eastern Parkway de-interlining post. Because NYTIP is still a work in progress, I’m removing language referring to recommended plans, and instead listing the options I’m currently considering.

Welcome back to my ongoing series on the New York Transportation Improvement Plan (NYTIP)! When I introduced NYTIP, I outlined a three-point plan for fixing the NYC Subway system: enhance, extend, and expand. This post summarizes the last five posts, which addressed the first point – enhance.

[Let’s recap!]

NYTIP – enhancing the nyc subway, part 1: central park west

UPDATE (03.10.2021): Post revised for clarity. Because NYTIP is still a work in progress, I’m removing language referring to recommended plans, and instead listing the options I’m currently considering.

In my last post, I introduced the New York Transportation Improvement Plan (NYTIP). In that post, I outlined a three-point plan for fixing the NYC Subway:

  1. Enhance (minimize merging conflicts)
  2. Extend (extend existing lines)
  3. Expand (build new lines)

Regarding point 1 (enhance), I’ll begin with the Central Park West (CPW) trunk line, which serves the A, B, C, and D trains.

[Let’s begin!]