NYTIP – extending the nyc subway: sas phase 2 and laguardia airport

UPDATE (04.02.2022): Removed a dead link.

Welcome to my ongoing NYTIP series! In this series of posts, I will expound on point 2 in my three-point plan to fix the NYC Subway – extend. I will begin by discussing Phase 2 of the Second Avenue Subway (SAS) and subway service to LaGuardia Airport.

[let’s do this!]

NYTIP – enhancing the nyc subway: broadway and queens boulevard

UPDATE (09.07.2022): Post substantially revised to reflect v1.0.0 v0.8.0 of the enhanced NYC subway on 09.05.2022. This update adds commentary on the transfer passage between 51st Street and Lexington Avenue – 53rd Street stations.

In my last post, I discussed the South Brooklyn redesign. So far, the redesigns contemplated by NYTIP only involve operational changes. In this post, we’ll explore the Broadway (N, Q, R, and W) and Queens Boulevard (E, F, M, and R) trunk lines. While redesigning the former is trivial, the latter is much more challenging.

[Let’s dive in!]